Program of the Vsemina workshop



 8:00 9:00 13:0015:00 19:00
18.8. a r r i v a l    dinner
19.8.breakfast Moderator: P. Privitera
  • Introduction: P.Mantsch (10')
  • APERTURE SYSTEM
    1. Overall System (box, corrector ring, fail safe curtain, refl. screen): H.Klages (15')
    2. Ref. Points, Alignment & Procedures: R.Gumbsheimer (10')
    3. Current Status of Shutters, Aperture Boxes & Lenses in Campinas: C.Escobar (30')
    4. Filters: R. Cester (10')
    5. Overall Production Schedule & WBS: J.Kleinfeller (5')
  • Coffee break
  • MIRRORS
    1. Mirror Supports & Mounts: R.Gumbsheimer (10')
    2. Aluminium Mirrors: H.Klages (10')
    3. Glass Mirrors: M.Hrabovsky (10')
    4. Overall Production Schedule & WBS: J.Kleinfeller (5')
lunch Moderator: J. Kleinfeller
  • CAMERA
    1. Mechanics: C.Aramo (9')
    2. Light Collectors: G.Matthiae (6')
    3. PMT Units: G.Matthiae (12')
    4. Cabling: G.Matthiae (7')
    5. Distribution Boards: G.Matthiae (6')
    6. Overall Production Schedule & WBS: G.Matthiae (5')
  • Coffee break
  • CALIBRATION
    1. Relative Calibration: J.Matthews (10')
    2. Absolute Calibration: J.Matthews (15')
    3. Atmospheric Monitoring: J.Matthews (10')
    4. Overall Production Schedule & WBS: J.Matthews (5')
  • PURPOSE OF EA AND RESULTS
    1. EA Telescope: J.Kleinfeller (10')
    2. Torino Telescope Results: D.Maurizio (10')
    3. First Results from FD Commissioning: P.Privitera (10')
    4. Overall Production Schedule & WBS: J.Kleinfeller (5')
  • 18:10 - 19:00 Time for CDR reviewers.
dinner
20.8.breakfast Moderator: G. Matthiae
  • ANALOG FDE
    1. Introduction to the FDE System: H.Gemmeke (10')
    2. Overview of the Analog Signal Processor: D.Camin (10')
    3. Head Electronics. Status report: D.Camin (20')
    4. Analog Board. Status Report: S.Argiro (20')
    5. HV/LV Power Supplies System: D.Camin (5')
    6. Recent Results on Star Tracking: M.Lapolla (15')
    7. Selected Results on Analog FDE: H.Gemmeke (15')
    8. Overall Production Schedule & WBS: D.Camin (5')
  • Coffee break
  • DIGITAL FDE
    1. Status of Digital FDE: M.Kleifges (30')
    2. Updates of FLT and SLT Functionality: A.Menshikov (20')
lunch excursion - AUSTERLITZ MEMORIAL
21.8.breakfast Moderator: H. Klages
  • DIGITAL FDE
    1. Status of Hardware-Software Interface: A.Kopmann (30')
    2. Status of DAQ: H-J.Mathes (30')
    3. Status of Slow-Control: J.Kleinfeller (15')
    4. Overall Production Schedule & WBS: M.Kleifges (5')
  • Coffee break
  • FD EA TESTS & CDR CONCLUSIONS
    1. Laser and Flasher FD Performance Test Results: P.Sommers (60')
    2. Discussion(40')
    3. CDR Concluding remarks: P.Mantsch (5')
lunch Chairman: H. Wilczynski
  • FD SOFTWARE
    1. FD Monitoring: F.Lefebvre (20')
    2. Auger Hybrid Operation: B.Fick (25')
    3. Flores: an FD Offline Reconstruction Framework: S.Argiro (20')
    4. New Developments for CORSIKA and Production of Shower Libraries: H.Klages (20')
  • Simulation of FD Optical System: M.Bohacova (15')
  • Coffee break
  • FD SIMULATIONS
    1. Actual Lateral Distr. of Showers and Width of their Images in FD: M.Giller (15')
    2. Size of an Air Shower Image Derived from CORSIKA: D.Gora (15')
    3. Image of Simulated EAS on FD Camera: W.Tkaczyk (15')
    4. Extensive Air Shower Light Composition: P.Homola (15')
dinner
22.8.breakfast Chairman: J. Grygar
  • LIDAR SYSTEM
    1. Status of the Lidar System: M.Zavrtanik (25')
    2. LIDAR system at Torino: M.Mostafa (15')
    3. Nitrogen Laser for Calibration and Aerosol Phase Function: E.Fokitis (15')
  • Coffee break
  • FD COMPONENTS
    1. Thin Mirror Made in Puebla: C.Robledo (10')
    2. Thin Mirror Made in Puebla: A.Cordero (10')
    3. Few Remarks on FD Optical System: M.Palatka (20')
    4. Some Results from EA FD Telescope: M.Vlcek (20')
    5. Optical filter work in Athens: E.Fokitis (15')
lunch Chairmen: J.Kleinfeller,P.Mantsch
    GENERAL DISCUSSION
dinner party
23.8. breakfast d e p a r t u r e