| 8:00 | 9:00 | 13:00 | 15:00 | 19:00 |
18.8. | a r r i v a l
| dinner |
19.8. | breakfast |
Moderator: P. Privitera
- Introduction: P.Mantsch (10')
- APERTURE SYSTEM
- Overall System (box, corrector ring, fail safe curtain, refl. screen): H.Klages (15')
- Ref. Points, Alignment & Procedures: R.Gumbsheimer (10')
- Current Status of Shutters, Aperture Boxes & Lenses in Campinas:
C.Escobar (30')
- Filters: R. Cester (10')
- Overall Production Schedule & WBS: J.Kleinfeller (5')
- Coffee break
- MIRRORS
- Mirror Supports & Mounts: R.Gumbsheimer (10')
- Aluminium Mirrors: H.Klages (10')
- Glass Mirrors: M.Hrabovsky (10')
- Overall Production Schedule & WBS: J.Kleinfeller (5')
|
lunch |
Moderator: J. Kleinfeller
- CAMERA
- Mechanics: C.Aramo (9')
- Light Collectors: G.Matthiae (6')
- PMT Units: G.Matthiae (12')
- Cabling: G.Matthiae (7')
- Distribution Boards: G.Matthiae (6')
- Overall Production Schedule & WBS: G.Matthiae (5')
- Coffee break
- CALIBRATION
- Relative Calibration: J.Matthews (10')
- Absolute Calibration: J.Matthews (15')
- Atmospheric Monitoring: J.Matthews (10')
- Overall Production Schedule & WBS: J.Matthews (5')
- PURPOSE OF EA AND RESULTS
- EA Telescope: J.Kleinfeller (10')
- Torino Telescope Results: D.Maurizio (10')
- First Results from FD Commissioning: P.Privitera (10')
- Overall Production Schedule & WBS: J.Kleinfeller (5')
- 18:10 - 19:00 Time for CDR reviewers.
|
dinner |
20.8. | breakfast |
Moderator: G. Matthiae
- ANALOG FDE
- Introduction to the FDE System: H.Gemmeke (10')
- Overview of the Analog Signal Processor: D.Camin (10')
- Head Electronics. Status report: D.Camin (20')
- Analog Board. Status Report: S.Argiro (20')
- HV/LV Power Supplies System: D.Camin (5')
- Recent Results on Star Tracking: M.Lapolla (15')
- Selected Results on Analog FDE: H.Gemmeke (15')
- Overall Production Schedule & WBS: D.Camin (5')
- Coffee break
- DIGITAL FDE
- Status of Digital FDE: M.Kleifges (30')
- Updates of FLT and SLT Functionality: A.Menshikov (20')
|
lunch |
excursion - AUSTERLITZ MEMORIAL |
21.8. | breakfast |
Moderator: H. Klages
- DIGITAL FDE
- Status of Hardware-Software Interface: A.Kopmann (30')
- Status of DAQ: H-J.Mathes (30')
- Status of Slow-Control: J.Kleinfeller (15')
- Overall Production Schedule & WBS: M.Kleifges (5')
- Coffee break
- FD EA TESTS & CDR CONCLUSIONS
- Laser and Flasher FD Performance Test Results: P.Sommers (60')
- Discussion(40')
- CDR Concluding remarks: P.Mantsch (5')
|
lunch |
Chairman: H. Wilczynski
- FD SOFTWARE
- FD Monitoring: F.Lefebvre (20')
- Auger Hybrid Operation: B.Fick (25')
- Flores: an FD Offline Reconstruction Framework: S.Argiro (20')
- New Developments for CORSIKA and Production of Shower Libraries: H.Klages (20')
- Simulation of FD Optical System: M.Bohacova (15')
- Coffee break
- FD SIMULATIONS
- Actual Lateral Distr. of Showers and Width of their Images in FD: M.Giller (15')
- Size of an Air Shower Image Derived from CORSIKA: D.Gora (15')
- Image of Simulated EAS on FD Camera: W.Tkaczyk (15')
- Extensive Air Shower Light Composition: P.Homola (15')
|
dinner |
22.8. | breakfast |
Chairman: J. Grygar
- LIDAR SYSTEM
- Status of the Lidar System: M.Zavrtanik (25')
- LIDAR system at Torino: M.Mostafa (15')
- Nitrogen Laser for Calibration and Aerosol Phase Function: E.Fokitis (15')
- Coffee break
- FD COMPONENTS
- Thin Mirror Made in Puebla: C.Robledo (10')
- Thin Mirror Made in Puebla: A.Cordero (10')
- Few Remarks on FD Optical System: M.Palatka (20')
- Some Results from EA FD Telescope: M.Vlcek (20')
- Optical filter work in Athens: E.Fokitis (15')
|
lunch |
Chairmen: J.Kleinfeller,P.Mantsch |
dinner party |
23.8. | breakfast | d e p a r t u r e |